← Back to home
Comparison · PM

Ever Teams vs Leantime

A side-by-side editorial comparison of Ever Teams and Leantime — release velocity, themes, recent moves, and the top alternatives to consider.

Shared themes:self-hosted

Ever Teams vs Leantime: at a glance

FeatureEver TeamsLeantime
SectorPMPM
Velocity score5.05.0
Sparks · 30d00
Top themestime-tracking, task-views, integrations, collaborative-docsproject-management, self-hosted, permissions, plugins
Last editorial update1d ago2d ago
WebsiteVisit →Visit →

What is Ever Teams?

Ever Teams tags dozens of versions a day; most are fixes and test changes.

Ever Teams tags several releases a day. On 12 November 0.196 added a Jira Cloud integration section, timer notes and a Workspace settings page, and 0.197 added a due-date calendar, drag-to-reschedule and a Table layout for team tasks. The releases tagged around midnight on 13 November are small: a dismissable newsletter card, spelling-list and test fixes, a dependency bump, Docs export fixes, and in 0.199.0 a keyboard shortcut to assign tasks.

Read the full Ever Teams trajectory →

What is Leantime?

Leantime swaps role ranks for real permissions and syncs with your calendar app.

Leantime moved from 3.10 to 3.14 between October and 10 November. v3.14.0 replaces role-rank checks with specific permission checks across projects, timesheets, users, API keys, to-dos, milestones and sprints, and opens the calendar to plugins; a new CalDAV plugin syncs both ways with Nextcloud, Radicale and Apple Calendar. Earlier releases added mobile push, per-project modules, global search and self-updating plugins.

Read the full Leantime trajectory →

Ever Teams vs Leantime: editorial side-by-side

E5.0

Ever Teams tags dozens of versions a day; most are fixes and test changes.

◆ Current state

Ever Teams tags several releases a day. On 12 November 0.196 added a Jira Cloud integration section, timer notes and a Workspace settings page, and 0.197 added a due-date calendar, drag-to-reschedule and a Table layout for team tasks. The releases tagged around midnight on 13 November are small: a dismissable newsletter card, spelling-list and test fixes, a dependency bump, Docs export fixes, and in 0.199.0 a keyboard shortcut to assign tasks.

◆ Where it's heading

The project ships through an automated release loop that tags every merged change, so version numbers say little about scope. Real features still arrive every day or two, aimed at task views, time tracking and integrations with other project tools.

◆ Prediction

Expect the version count to keep climbing quickly, with the occasional release adding a task view or integration among many fix-only tags.

L5.0

Leantime swaps role ranks for real permissions and syncs with your calendar app.

◆ Current state

Leantime moved from 3.10 to 3.14 between October and 10 November. v3.14.0 replaces role-rank checks with specific permission checks across projects, timesheets, users, API keys, to-dos, milestones and sprints, and opens the calendar to plugins; a new CalDAV plugin syncs both ways with Nextcloud, Radicale and Apple Calendar. Earlier releases added mobile push, per-project modules, global search and self-updating plugins.

◆ Where it's heading

The release cadence is roughly one feature version every two weeks, split between finer access control and a plugin marketplace that carries more functionality. Core changes increasingly exist to give plugins stable hooks, as the calendar rework shows.

◆ Prediction

Expect more marketplace plugins built on the new calendar and permission hooks, and further permission work extending to the remaining modules.

Alternatives to Ever Teams and Leantime

Other PM products tracked by Sparkpulse, ranked by recent ship velocity. Each card links to a full editorial trajectory and lets you pivot into a head-to-head comparison with either Ever Teams or Leantime.

See all Ever Teams alternatives → · See all Leantime alternatives →

Recent activity from Ever Teams and Leantime

Latest ship moves from both products, interleaved chronologically. ⚡ = editorial spark.

  1. 1d agoEver Teams0.199.0 adds a shortcut to assign tasks from the list
  2. 1d agoEver Teams0.198.4 fixes Docs folder export and Timesheets export
  3. 1d agoEver Teams0.198.3 bumps @hono/node-server
  4. 1d agoEver Teams0.198.2 fixes a flaky work-diary test
  5. 1d agoEver Teams0.198.1 adds test words to the spell-check list
  6. 1d agoEver Teams0.198.0 stops showing the newsletter card after sign-up
  7. 3d agoLeantimev3.14.0: per-permission access checks and a CalDAV sync plugin
  8. 14d agoLeantimev3.13.2: digest changes, OIDC PKCE, marketplace install reporting
  9. 14d agoLeantimev3.13.1: clearer plugin install errors
  10. 14d agoLeantimev3.13.0: mobile push, per-project modules, Laravel 12
  11. 29d agoLeantimev3.12.0: self-updating plugins and a shared interface library
  12. 1mo agoLeantimev3.11.0: global search across the workspace

Frequently asked questions

What is the difference between Ever Teams and Leantime?

Both compete on the same themes — self-hosted — within PM. Ever Teams and Leantime are shipping at a similar cadence (velocity 5.0 vs 5.0, both within Sparkpulse's "active" band). See the at-a-glance table above for a side-by-side breakdown of velocity, recent sparks, and editorial themes.

Is Ever Teams better than Leantime?

Sparkpulse doesn't pick a winner — we score release velocity, not feature parity. Ever Teams and Leantime are shipping at a similar cadence (velocity 5.0 vs 5.0, both within Sparkpulse's "active" band). For your specific use case, the alternatives sections above list other PM products to evaluate alongside.

What are the best alternatives to Ever Teams?

Top Ever Teams alternatives in PM are ranked by recent ship velocity. Browse the "Ever Teams alternatives" section above for the current picks, or visit /alternatives/ever-teams for the full list with editorial commentary on each.

What are the best alternatives to Leantime?

Top Leantime alternatives in PM are ranked by recent ship velocity. Browse the "Leantime alternatives" section above for the current picks, or visit /alternatives/leantime for the full list with editorial commentary on each.