← Back to home
Comparison · Analytics

ggcorrplot vs tern.mmrm

A side-by-side editorial comparison of ggcorrplot and tern.mmrm — release velocity, themes, recent moves, and the top alternatives to consider.

ggcorrplot vs tern.mmrm: at a glance

Featureggcorrplottern.mmrm
SectorAnalyticsAnalytics
Velocity score2.50.0
Sparks · 30d00
Top themescorrelation, r, ggplot2, visualizationpharmaverse, mmrm, tabulation, maintenance
Last editorial update9h ago1h ago
WebsiteVisit →Visit →

What is ggcorrplot?

ggcorrplot came back after four years and found its significance markers had been lying

ggcorrplot draws correlation matrices in ggplot2 with optional significance marking and hierarchical reordering. It sat untouched from late 2022 until mid-2026, then shipped 0.2.0 and 0.3.0 sixteen days apart. Between them they added the display options users had been requesting since 2016 and repaired a set of bugs where hc.order = TRUE silently changed which cells were marked significant.

Read the full ggcorrplot trajectory →

What is tern.mmrm?

An MMRM tabulation package that has published nothing since its 2024 CRAN releases.

tern.mmrm wraps mixed models for repeated measures into the tern tabulation and plotting layer used by teal clinical modules. The visible history ends with three CRAN releases in mid-to-late 2024; before that the feed carries only automated version bumps from 2022, three of which have just been backfilled into the record. The most recent substantive change adds axis limit arguments to the LS-means plot.

Read the full tern.mmrm trajectory →

ggcorrplot vs tern.mmrm: editorial side-by-side

G
ggcorrplot
ANALYTICS
2.5

ggcorrplot came back after four years and found its significance markers had been lying

◆ Current state

ggcorrplot draws correlation matrices in ggplot2 with optional significance marking and hierarchical reordering. It sat untouched from late 2022 until mid-2026, then shipped 0.2.0 and 0.3.0 sixteen days apart. Between them they added the display options users had been requesting since 2016 and repaired a set of bugs where hc.order = TRUE silently changed which cells were marked significant.

◆ Where it's heading

Both releases chase the same target: parity with the older corrplot package inside a ggplot2 object. Significance stars appended to coefficient labels, circle scaling, decimal control, then boxed cells and glyphs sized by absolute correlation — these are corrplot's visual vocabulary reimplemented where they can be composed with other ggplot2 layers. The bug fixes point the other way, at foundations: p-values matched to cells by name rather than row position, clustering computed on the unrounded matrix, tl.col actually applied.

◆ Prediction

With the corrplot look largely reproduced and the correctness backlog cleared, the remaining gap is the mixed upper/lower display corrplot supports; that is the natural next argument if the current release pace holds.

T
tern.mmrm
ANALYTICS
0.0

An MMRM tabulation package that has published nothing since its 2024 CRAN releases.

◆ Current state

tern.mmrm wraps mixed models for repeated measures into the tern tabulation and plotting layer used by teal clinical modules. The visible history ends with three CRAN releases in mid-to-late 2024; before that the feed carries only automated version bumps from 2022, three of which have just been backfilled into the record. The most recent substantive change adds axis limit arguments to the LS-means plot.

◆ Where it's heading

Content per release is thin and largely organisational: a maintainer change, replacing scda with random.cdisc.data in vignettes, and adapting to new {mmrm} versions. The package appears to be in maintenance, tracking its upstream dependency rather than developing independently. The 2022 entries now visible are release-automation commits, not releases in any meaningful sense.

◆ Prediction

Nothing here signals new functionality; the realistic next event is another compatibility release when {mmrm} or {rtables} changes underneath it.

Alternatives to ggcorrplot and tern.mmrm

Other Analytics products tracked by Sparkpulse, ranked by recent ship velocity. Each card links to a full editorial trajectory and lets you pivot into a head-to-head comparison with either ggcorrplot or tern.mmrm.

See all ggcorrplot alternatives → · See all tern.mmrm alternatives →

Recent activity from ggcorrplot and tern.mmrm

Latest ship moves from both products, interleaved chronologically. ⚡ = editorial spark.

  1. 22d agoggcorrplotggcorrplot 0.3.0 adds boxed cells and correlation-sized squares
  2. 1mo agoggcorrplotggcorrplot 0.2.0 fixes significance markers broken by hc.order
  3. 1y agotern.mmrmAxis limits added to the LS-means plot
  4. 2y agotern.mmrmMaintainer change and scda replaced in vignettes
  5. 2y agotern.mmrmCRAN 0.3.0 release, mostly workflow housekeeping
  6. 3y agoggcorrplotggcorrplot 0.1.4
  7. 3y agotern.mmrmAutomated version bump to 0.2.1
  8. 3y agotern.mmrmPre-release branch merge
  9. 4y agotern.mmrmCI automation commit, no release content
  10. 6y agoggcorrplotggcorrplot 0.1.3
  11. 7y agoggcorrplotggcorrplot 0.1.2
  12. 10y agoggcorrplotggcorrplot's first release: correlograms in ggplot2

Frequently asked questions

What is the difference between ggcorrplot and tern.mmrm?

They serve adjacent needs but don't currently overlap on shipped themes. ggcorrplot is currently shipping more aggressively (velocity 2.5 vs 0.0), with 0 editorial sparks in the last 30 days against 0. See the at-a-glance table above for a side-by-side breakdown of velocity, recent sparks, and editorial themes.

Is ggcorrplot better than tern.mmrm?

Sparkpulse doesn't pick a winner — we score release velocity, not feature parity. ggcorrplot is currently shipping more aggressively (velocity 2.5 vs 0.0), with 0 editorial sparks in the last 30 days against 0. For your specific use case, the alternatives sections above list other Analytics products to evaluate alongside.

What are the best alternatives to ggcorrplot?

Top ggcorrplot alternatives in Analytics are ranked by recent ship velocity. Browse the "ggcorrplot alternatives" section above for the current picks, or visit /alternatives/ggcorrplot for the full list with editorial commentary on each.

What are the best alternatives to tern.mmrm?

Top tern.mmrm alternatives in Analytics are ranked by recent ship velocity. Browse the "tern.mmrm alternatives" section above for the current picks, or visit /alternatives/tern-mmrm for the full list with editorial commentary on each.