RMVMR
RMVMR is being tidied in lockstep with MVMR, the package it wraps
A side-by-side editorial comparison of shapviz and spatstat — release velocity, themes, recent moves, and the top alternatives to consider.
shapviz refines its SHAP plots release by release while chasing ggplot2's moving target.
shapviz turns SHAP values from XGBoost, LightGBM, H2O, kernelshap and other sources into standard diagnostic plots — importance, dependence, waterfall, force and interaction. Recent work is plot ergonomics: shared y-axis control across dependence plots, a bar view for interaction values, and axis collection via patchwork. The two most recent releases are pure compatibility and bug fixes.
The spatstat umbrella package, now mostly a pointer to the sub-packages doing the work
spatstat is the front package of a family that was split into specialised components — spatstat.geom, spatstat.random, spatstat.model, spatstat.explore, spatstat.univar and spatstat.sparse. Its own release notes reflect that: entries in this window are largely announcements of where the real changes landed, plus documentation and cross-reference maintenance. The codebase it fronts passed 200,000 lines as of 3.5-1.
shapviz turns SHAP values from XGBoost, LightGBM, H2O, kernelshap and other sources into standard diagnostic plots — importance, dependence, waterfall, force and interaction. Recent work is plot ergonomics: shared y-axis control across dependence plots, a bar view for interaction values, and axis collection via patchwork. The two most recent releases are pure compatibility and bug fixes.
Two threads run in parallel here. One is visual refinement converging on conventions from Python's shap — the 0.10.0 notes openly float switching share_y to TRUE to match it. The other is connector maintenance, keeping pace with H2O, XGBoost 1.x and 2.x, shapr and permshap as each changes. Neither thread adds new explanation methods; shapviz's job is presentation, and it is being polished rather than extended.
Expect share_y = TRUE to become the default and further ggplot2 4.x fallout, with connector updates arriving as the upstream SHAP packages release.
spatstat is the front package of a family that was split into specialised components — spatstat.geom, spatstat.random, spatstat.model, spatstat.explore, spatstat.univar and spatstat.sparse. Its own release notes reflect that: entries in this window are largely announcements of where the real changes landed, plus documentation and cross-reference maintenance. The codebase it fronts passed 200,000 lines as of 3.5-1.
The split is effectively complete and the umbrella's role has settled into coordination — tracking version dependencies across sub-packages and pointing users to them. The family has kept subdividing over this period, with spatstat.univar joining in 3.1-0. The one substantive user-facing addition here is documentation infrastructure: 3.3-0 added the ability to list the history of changes to a specific function, which is a navigational answer to a codebase now spread across many packages.
Expect this package's notes to continue summarising sub-package activity rather than carrying features of its own, since every release in this window does exactly that. Read spatstat.geom, spatstat.random and spatstat.model for the substance.
Other Analytics products tracked by Sparkpulse, ranked by recent ship velocity. Each card links to a full editorial trajectory and lets you pivot into a head-to-head comparison with either shapviz or spatstat.
RMVMR is being tidied in lockstep with MVMR, the package it wraps
geoarrow tracks the GeoArrow spec and otherwise just keeps compiling
n2khab keeps retracting interpretations of habitat data it can't actually support
tidypolars is grinding toward complete dplyr coverage, one supported function at a time
OneSampleMR found that argument order in a formula was silently changing its estimates
bpbounds found the same swapped-cell bug twice and clamped its bounds back into range
See all shapviz alternatives → · See all spatstat alternatives →
Latest ship moves from both products, interleaved chronologically. ⚡ = editorial spark.
They serve adjacent needs but don't currently overlap on shipped themes. shapviz and spatstat are shipping at a similar cadence (velocity 0.0 vs 0.0, both within Sparkpulse's "active" band). See the at-a-glance table above for a side-by-side breakdown of velocity, recent sparks, and editorial themes.
Sparkpulse doesn't pick a winner — we score release velocity, not feature parity. shapviz and spatstat are shipping at a similar cadence (velocity 0.0 vs 0.0, both within Sparkpulse's "active" band). For your specific use case, the alternatives sections above list other Analytics products to evaluate alongside.
Top shapviz alternatives in Analytics are ranked by recent ship velocity. Browse the "shapviz alternatives" section above for the current picks, or visit /alternatives/shapviz for the full list with editorial commentary on each.
Top spatstat alternatives in Analytics are ranked by recent ship velocity. Browse the "spatstat alternatives" section above for the current picks, or visit /alternatives/spatstat-r for the full list with editorial commentary on each.